本文根據(jù)任務(wù)書上所給的系統(tǒng)與線路及負(fù)荷參數(shù),分析擬建變電站的進(jìn)出線方向和負(fù)荷等資料,從可靠性、安全性、經(jīng)濟(jì)性等方面考慮,確定了電氣主接線方式。并通過對負(fù)荷資料的分析,安全,經(jīng)濟(jì)及可靠性方面考慮,確定了110kV,35kV,10kV以及站用電的主接線,然后又通過負(fù)荷計算及供電范圍確定了主變壓器臺數(shù),容量及型號,同時也確定了站用變壓器的容量及型號,最后,根據(jù)最大持續(xù)工作電流及短路計算的計算結(jié)果,對高壓熔斷器,隔離開關(guān),母線,絕緣子和穿墻套管,電壓互感器,電流互感器進(jìn)行了選型,然后進(jìn)行配電裝置和平面布置的設(shè)計以及防雷的設(shè)計,從而完成了110kV電氣一次部分的設(shè)計。
關(guān)鍵詞:變電站 變壓器 接線
Abstract
This article according to the system logical circuit which and the load parameter in the project description gives, the analysis plans to construct the transformer substation to enter material and so on going beyond a line direction and load, from aspects and so on reliability, security, efficiency considered, has determined the electrical main wiring way. And through to shoulders the material the analysis, safe, the economy and the reliable aspect considered, had determined 110kV,35kV,10kV as well as the station use electricity the main wiring, then calculated through the load and supplies power the scope to determine the main transformer Taiwan number, the capacity and the model, simultaneously also had determined stood with transformer's capacity and the model, finally, according to most greatly continually the operating current and the short circuit computation's computed result, to the high-pressured fuse, the isolator, the bus bar, the insulator and put on the wall drive pipe, the voltage transformer, the current transformer has carried on the shaping, then carried on the power distribution equipment and the plane layout design as well as the anti-radar design, thus has completed 110kV electricity partial designs.
Key word: Transformer substation transformer wiring